Afternoon sun falling through tall old windows into an unrenovated room with bare plaster walls

One sheet of graph paper, one crew.

Every Squarefoot job starts the same way: we measure your rooms square by square, draw what they could become and price it line by line. Then the people who drew it build it, from the first skip to the last skirting board.

one square on our paper = one square foot of your house

From pencil to keys, with the same four people

no hand-offs, no strangers on site

A renovation goes wrong in the gaps between a designer, a builder and the trades. We closed the gaps: one small team measures, draws, gets the permissions and builds, and you have one phone number for all of it.

A builder in paint-spattered overalls holding a hard hat and a measuring tape
1 · measure
A hand-drawn floor plan of a house with walls, stairs and doorways
2 · draw
A ground floor mid-renovation with plasterboard, a mitre saw and tools across the floor
3 · build
A finished open-plan kitchen with an island, a tall blue cupboard and a dining table
4 · hand over
  1. Rooms, measured

    A free site visit. We measure every room, photograph every wall and ask how you actually live in the house: who cooks, where the coats end up, which door always sticks.

    about 90 minutes, tea welcome

  2. Plans, drawn

    Within two weeks you get scaled drawings on graph paper, three layouts to choose from and an itemised price. Planning, party-wall notices and building control are ours to handle.

    changes on paper cost nothing

  3. Walls, raised

    One site lead, one crew and a weekly diary with photos. The joiner who fits your kitchen is the one who drew its cabinets, so nothing is lost between the plan and the room.

    site swept every evening

  4. Keys, handed over

    We walk the finished rooms with you, clear every item on the snag list and leave the house cleaner than we found it, with the drawings, certificates and guarantees in one folder.

    ten-year workmanship guarantee

What we build, room by room

Most of our houses are Edwardian terraces and 1930s semis. We know their walls, their floors and their quirks, and we plan every room as part of the whole house.

Whole-house refurbishment

Rewiring, heating, plaster, sash windows and joinery for older houses, done in an order that keeps one room liveable.

Cellar conversions

Tanking, damp-proofing and a light well: a dry room under your feet.

Kitchens

Layouts drawn around how you cook, then units, worktops, plumbing and electrics under one contract.

Rear and side-return extensions

Steel, a glass roof and wide doors to the garden: the kitchen-diner the house never had.

Loft conversions

Dormers, a proper staircase and an en-suite.

Bathrooms

Moved, enlarged or simply done properly.

← street side

a typical terrace, ground floor and loft

garden side →

Priced by the square foot

every quote itemised, line by line

Prices include labour, materials, waste removal and VAT; fixtures you choose yourself are listed separately. Every quote is fixed for 60 days.

Finished rooms

Five houses from last year. Each room was a pencil drawing on our graph paper before it was a room, and each one came out the way it was drawn.

drawn in blue, built in colour

A pine kitchen with a timber ceiling, open shelves and a window over the sink

The pine kitchen

Chorlton · kitchen in a 1905 terrace · 9 weeks

kept the original boards

A loft bedroom with white walls and sunlight pouring through a large skylight

Bedroom under the skylight

Didsbury · loft conversion with en-suite · 12 weeks

stairs drawn three times

A bathroom with green tiles, a marble wall, a round mirror and a dark vanity unit

The green bathroom

Levenshulme · bathroom moved upstairs · 5 weeks

tiles set out on paper first

A restored front room with tall sash windows, a timber fireplace and a polished wooden floor

Front room, sashes restored

Whalley Range · windows, plaster and floor · 7 weeks

every sash rehung by hand

A bright kitchen-diner with white units, black pendant lights and a long wooden table

The long kitchen-diner

Burnage · 260 sq ft rear extension · 16 weeks

the back wall is now a steel

The site diary

sent every friday, with photos

Every client gets a weekly page from the site lead: what happened, what is next and what we need you to decide. Here are a few pages from an extension in Chorlton.

  1. Week 1

    Skip on the road, letters through the neighbours' doors. Kitchen stripped back to brick and the old boiler gone.

  2. Week 2

    Footings dug and inspected. Building control signed them off on Thursday morning.

  3. Week 4

    The steel is in. The back wall has gone and the room suddenly feels twice the size.

An empty room stripped for renovation, with exposed brick and bare walls
week 1, stripped back
A gloved hand cutting a sheet of plasterboard along a folding rule
week 9, boards cut to the plan
  1. Week 6

    Glass roof on, first fix of wiring and pipes. It rained all Tuesday: the roof stayed dry.

  2. Week 9

    Plaster, then the floor. Units delivered and stacked in the front room under dust sheets.

  3. Week 11

    Worktops fitted. Snag walk with Amara and Tunde on Friday; four items on the list, all closed by Tuesday.

Before we start, we write to your neighbours

through every door on both sides

Dear neighbours at numbers 38 and 42,

From Monday 3 March we will be building a rear extension at number 40. Before we start, here is what you can expect from us.

We work 8 am to 5 pm on weekdays, never on Sundays. The skip is covered every evening and the pavement swept before we leave. Deliveries arrive before 9:30, so the road is clear for the school run.

The noisiest days come in weeks 2 and 4, when the footings are dug and the back wall comes down. We will knock on your door the day before each.

If anything bothers you, call Dan, our site lead, on 0161 000 0000. He would rather hear about it on day one than in week ten.

With thanks and a tin of biscuits, the Squarefoot crew

Snag list · 40 Example Road

walked through on friday with the owners

  • Garden door catches on the frame
  • Grout haze on the splashback
  • Socket by the hob slightly off level
  • Paint nick on a stair spindle
  • Extractor hood rattles on high
  • Bathroom door closes too fast

Signed off

The snag list ends empty

Every job finishes with a slow walk through the new rooms. Whatever you notice goes on the list, and whatever is on the list is fixed before the final invoice, usually within the week.

After that, our workmanship is guaranteed for ten years, in writing, and the same site lead answers the phone if a door ever sticks again.

Start with a site visit

Heard over the garden fence

from owners, and once from a neighbour

Questions

Asked at the kitchen table

The questions we hear on almost every first visit. Anything else, ask Dan on the phone.

0161 000 0000
  • Do I need planning permission for a rear extension?

    Many single-storey rear extensions fall under permitted development, but terraces and conservation areas have their own limits. We check on the first visit and handle the application or a lawful development certificate when it is needed.

  • How long does a typical job take?

    Bathrooms take four to six weeks, kitchens six to nine, lofts ten to twelve and rear extensions twelve to sixteen. The programme is drawn week by week before we start, and the diary tells you where we are against it.

  • Can we stay in the house during the work?

    Usually, yes. We seal off the work with dust screens, keep a temporary kitchen running when we can and plan the noisy and the no-water days with you in advance.

  • How do payments work?

    A small deposit books your start date. After that you pay in stages tied to finished work, never ahead of it, and five per cent is held until the snag list is empty.

  • Are you insured and certified?

    Yes. We carry public liability and contract works insurance, our electrics and gas work are certified, and every certificate goes into the handover folder with the drawings.

Book a free site visit

Tell us a little about the house and the room you keep sketching. Dan will call within one working day to find a time that suits you.

sketches welcome, napkins too

A row of red-brick terraced houses with chimneys under a bright sky
our patch: terraces and semis, south Manchester
Yard
Example Yard, Manchester
Areas
Chorlton, Didsbury, Withington, Levenshulme, Burnage, Whalley Range